欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 相关公共服务平台入口

市场合作

Market cooperation
项目信息
发包方名称 Compania Nationala de Cai Ferate "CFR" - SA (RO 11054529)
发包方国别(国家/地区) 罗马尼亚
发包方座机
发包方传真
发包方邮箱 mirela.toma@cfr.ro
发包方地址
发包方网址
发包方联系人姓名
发包方联系人座机
发包方联系人手机
发包方联系人邮箱
项目名称 Railway Construction Works - Design And Execution Of Works Related To The Investment Objective "Rehabilitation Of The Railway Line Craiova-Drobeta Turnu Severin-Caransebeș, Part Of The Orient/East-Mediterranean Corridor"- Lot 3: Igiroasa ( Head Y ) – Dro
项目类型 其他 - 其他
项目预算¥
项目投标截止时间 2023-05-29
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
 Railway Construction Works - Design And Execution Of Works Related To The Investment ive "Rehabilitation Of The Railway Line Craiova-Drobeta Turnu Severin-Caransebeș, Part Of The Orient/East-Mediterranean Corridor"- Lot 3: Igiroasa ( Head Y ) – Drobeta Turnu Severin ( Head X ), Km 331+000 – Km 362+632, Cf Connections Of The Route Variant With Prunișor And Drobeta Marfă Stations, Drobeta Marfă Cf Station, Dudașu Cf Junction” Reference Number: 17.A/1/425/15.03.2023. / Ii.1.4) Brief Deion: Any Request For Clarification Must Be Submitted In Seap (Http://Www.E-Licitatie.Ro/Pub). Any Interested Economic Operator Has The Right To Request Clarifications/Additional Information In Relation To The Award Documentation 22 Days Before The Deadline Set For The Submission Of Offers. The Contracting Entity Will Respond Clearly And Completely To All Requests For Clarifications/Additional Information Regarding The Award Documentation On The 12th Day Before The Deadline For Submission Of Offers. The Contracting Entity Will Not Respond To Clarification Requests Sent After The Established Deadline. The Purchase Refers To The Obligations Of The Contractor/Contractor Related To Lot 3: Km 331+ 000 (Igiroasa Cap Y) - Km 333+000 (Start Varianta Balota) - Km 359+390 (Cap Y New Drobeta Est Station) - Km 362+632 (Cap X Drobeta Turnu Severin ) To Which Is Added The Cf Connection Of The Balota Version With The Existing Prunisor Cf Station, Cf Connection With The Drobeta Marfa Station ( Simian ), Drobeta Marfa Station And The Dudaşu Cf Connection, Having A Total Length Of 41.234 Km. The Contractor/Contractor Has The Obligation To Correlate The Works With The Contractor/Contractor On Lot 2: FiliaȘi ( Cap Y ) – Igiroasa ( Cap Y ), Km 286+735 – Km 331+000, As Well As On Lot 4: Drobeta Turnu Severin ( Cap X ) - Baile Herculane ( Cap X ) Km 362+632 - Km 404+250, Having A Total Length Of 41.618 Km In Order To Ensure The Continuity Of The Railway Section Craiova - Caransebeș With Regard To All Interoperability Systems. Suspensive Clause: The Award Procedure Is Carried Out Under The Present Suspensive Clause, In The Sense That The Signing Of The Contract For The Design And Execution Of Works Will Be Done Only After Securing The Funding Source. It Is Estimated That The Period During Which The Suspensive Clause Applies Is 12 Months From The Approval Of The Procedure Report.
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询