当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Bromford |
| 发包方国别(国家/地区) | 英国 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | Building 1 Chipping Sodbury Gloucestershire BS37 6JX United Kingdom |
| 发包方网址 | |
| 发包方联系人姓名 | Michael Keay |
| 发包方联系人座机 | 07803454911 |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | |
| 项目名称 | External Landscaping & Internal Communal Works at Coniston Road, Patchway, BS34 5JU |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2021-12-17 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 | The Works will involve external rear courtyard improvements and internal works to the block’s common areas. The flats are of non-traditional construction, namely Wimpey No Fines type, and were built in 1965. The block consists of 6 self contained flats. External wall insulation has already installed. 117- 127 Coniston Road can be accessed only at the rear by road. . The exterior courtyard is currently secure, is laid to tarmac, and surrounded by walls and other buildings. There are a number of rotary clothes lines installed, and bins and storage are highly visible from the flats. The brief is to improve the amenity of the courtyard and provide an area for communal recreation while retaining it’s function as an area for drying clothes. The scope of works covers the design and installation of new resin paving, washing lines, and landscaping to the private courtyard serving the flats. Internal works to the common areas will involve removal of asbestos suspended ceilings and replacement with new MF plasterboard, new floor finishes, new doors from the common areas to the courtyard, minor security upgrades and redecoration throughout. No structural works will be required. |
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9