当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Chesterfield Borough Council |
| 发包方国别(国家/地区) | 英国 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | Town Hall Rose Hill Chesterfield S40 1LP England |
| 发包方网址 | |
| 发包方联系人姓名 | Cameron Higginbottom |
| 发包方联系人座机 | +44 7921858550 |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | |
| 项目名称 | Refurbishment of Stephenson Memorial Hall – Chesterfield |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2021-12-14 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
Chesterfield Borough Council (CBC) is seeking to contract an experienced architect led multi-disciplinary team to progress the technical design of the refurbishment of the Stephenson Memorial Hall, Corporation Street, Chesterfield.
The Lead designer and consultants will be required to take the existing Stage 3 package of design work for the Stephenson Memorial Hall project from RIBA Work Stage 4 to RIBA Work Stage 6.
Chesterfield Borough Council owns and manages the Stephenson Memorial Hall. One part of the building is currently used as the Pomegranate Theatre and the other part as Chesterfield Museum.
The re-design of the building to RIBA Stage 3 combines the museum and theatre uses to enable the building to be seen as an integrated cultural venue in the town and extend the life of an important heritage asset.
The refurbishment must be complete by November 2024
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9