欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 PHILIPPINE STATE COLLEGE OF AERONAUTICS
发包方国别(国家/地区) 菲律宾
发包方座机
发包方传真
发包方邮箱
发包方地址 Canvasser Piccio Garden Villamor Air Pasay City Metro Manila Philippines 1300
发包方网址
发包方联系人姓名 Romualdo Salud Intia
发包方联系人座机 63-02-4255326
发包方联系人手机
发包方联系人邮箱
项目名称 SUPPLY, DELIVERY AND INSTALLATION OF TURBO JET TRAINER WITH REHEAT FOR PHILIPPINE STATE COLLEGE OF AERONAUTICS - INSTITUTE OF ENGINEERING AND TECHNOLOGY
项目类型 其他 - 其他
项目预算¥
项目投标截止时间 2022-01-17
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
1. The Philippine State College of Aeronautics, through the Corporate Budget for the contract approved by the governing Boards intends to apply the sum of Twenty Two Million Pesos (PhP 22,000,000.00) being the ABC to payments under the contract for the Supply, Delivery and Installation of Turbo JetTrainer with Reheat for the Philippine State College Of Aeronautics - Institute of Engineering and Technology /PB2021-G-09. Bids received in excess of the ABC shall be automatically rejected during bid opening.

2. The Philippine State College of Aeronautics now invites bids for the above Procurement Project. Delivery of the Goods is required within One Hundred Eighty (180) calendar days. Bidders should have completed, within two (2) years from the date of submission and receipt of bids, a contract similar to the Project. The deion of an eligible bidder is contained in the Bidding Documents, particularly, in Section II (Instructions to Bidders).

A. Turbo Jet Trainer with Reheat General Specifications:
1. Dimensions and Weight
• Width : not less than 1380 mm
• Height : not less than 1700 mm
• Length : not less than 1100mm
• Empty Weight : not less than 250kg

2. Other Specifications
• Gas Generator Turbine : not greater than 100,000 RPM
• Maximum Thrust or Power : not greater than 50 N or 45 hp
• Fuel Type I Grade : Aviation kerosene: ASTM D 1655 Jet A or alike
• Lubricating Oil Type : SAE 10W - 40 multigrade turbo diesel oil
• Electrical Supply : 220 VAC, 60Hz a.c. phase-phase 17 A
• Includes reheat (afterburner) section
• Fully interlocked starting procedure and automatic shut-down
• Automatic Data Acquisition (ADA) included (supplied with software)
• Supplied with ‘Gas Turbine Theory’ textbook
• Automatic shutdown conditions:
a. Ignition failure
b. Incorrect turbine speed
c. Oil pressure failure
d. Water supply failure
e. Incorrect temperatures
• This equipment emits sound levels greater than 100 dB(A)

3. Instruments and Features
• Shaft speed indicator
• Pressure, temperature, thrust indicator
• Fuel flow, level and pressure gauge

• Oil temperature and pressure gauge
• Nozzle area
• Total running hours indicator
• Full schematic colored instrumentation panel diagram

4. Exhaust Emissions Requirements
• Carbon Dioxide : not more than 2. 9%
• Carbon Monoxide : 240 - 900 ppm
• Nitrogen Dioxide : 0 - 1 ppm
• Sulfur Dioxide : 5 - 6 ppm
• Nitric Oxide : 11 – 26 ppm
• Combination of NO and NO2, (NOX) : 12 – 26 ppm

5. Other Inclusive Accessories
• Computer Ancillary
Computer Operating Processor : 2.4GHz or better
RAM : not less than 8 GB
Monitor : SVGA Compatible to 16-color, 1024 x 768
resolution or better
HDD : 2 TB or greater
CD ROM Drive : Available
Mouse : Standard three-button with scroll wheel
Compatible Data Acquisition Software
RS232 D-type serial COM port or USB (RS232 to USB Adaptor supplied)
Operating System : Microsoft Windows
Computer Table and Chair

6. Learning Outcomes
• Turbine, reheat and nozzle tests to find key performance information such as:
• Specific thrust and fuel consumption
• Pressure losses and ratios
• Thermal, propulsive, isentropic and mechanical efficiencies
• Work and power
• Thrust with and without reheat
• How the variable area nozzle affects thrust

B. Project Details and other Requirements

1. Other Project Requirements

The project will cover the installation of the equipment such as electrical wiring, cables and outlets, water supply and drain, oil vent and exhaust duct system shall be completed within the project duration requirement.

2. Allocated Budget for the Contract

The allocated budget for this project is TWENTY-TWO MILLION PESOS (22,000,000.00 Php) inclusive of taxes and other product, delivery and installation expenses.

3. Project Completion Period

Philippine State College of Aeronautics is expecting that the jet engine, installation and other required ancillaries will be delivered within 180 calendar days upon receipt of Notice to Proceed (NTP). The project will be declared complete if and only if the jet engine and other required ancillaries are properly installed and fully functional.

4. Delivery Place

The product is expected to be delivered at Philippine State College of Aeronautics,
Piccio Garden, Villamar, Pasay City.

5. Other Inclusive Services

The supplier also delivers the other inclusive packages such as but not limited to the following:
a. Faculty Training for not less than thirty (30) faculty members
b. Equipment maintenance and calibration for five (5) years
c. Product manuals and other supplemental manuals
d. Textbooks or experiment books related to the equipment

6. Warranty

a. Five-year warranty for the product and other accessories

C. Documentary Requirements

1. Requirementsof Product Providers
a. If the bidder is a Foreign Manufacturer
• Document showing the list of accredited service centers (owned or leased)
• Must be at least ISO 9001:2015 certified.
b. If the bidder is a First Tier Distributor
• Valid appointment of the bidder as First Tier Distributor issued by the manufacturer.
• Must be capable to deliver faculty training for faculty members and students, whether inside or outside the school premises. All trainers who will conduct and facilitate the training must be authorized and certified by the manufacturer.
• Supplier or distributor must be capable of delivering after sales maintenance, service and support.
• Submit 100% credit line certificate equivalent to approved budget ceiling (ABC).
• Proof showing that the manufacturer has been in the business manufacturing laboratory equipment for at least 15 years.

2. Post Qualification Parameters

Bidders shall provide a product demo (either actual or recorded) and brochures showing the conformity in the requirements and specification of the equipment.

3. Requirements if awarded the contract

a. For the purpose of information on the parts, components, systems, maintenance and operation of the jet engine with reheat shall be provided. Publications/Manuals shall be prepared in English language with electronic copies.

b. Technical Documents and Publication for the purpose of operation, maintenance and troubleshooting of the jet engine with reheat and its attendant support requirement will be provided such as but not limited to:

1. Maintenance/Troubleshooting Manual
2. Experiment/Laboratory Manual
3. User's Guide Manual

The supplier shall ensure that any discrepancy due to material failure shall be corrected and delivered to the end user at supplier's expense 30 calendar days upon the receipt of Notice of Discrepancy from Philippine State College of Aeronautics.

3. Bidding will be conducted through open competitive bidding procedures using a non-discretionary “pass/fail” criterion as specified in the 2016 revised Implementing Rules and Regulations (IRR) of Republic Act (RA) No. 9184.

a. Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least sixty percent (60%) interest or outstanding capital stock belonging to citizens of the Philippines, and to citizens or organizations of a country the laws or regulations of which grant similar rights or privileges to Filipino citizens, pursuant to RA No. 5183.

4. Prospective Bidders may obtain further information from Philippine State College of Aeronautics and inspect the Bidding Documents at the address given below during 9:00 AM to 5:00 PM.

5. A complete set of Bidding Documents may be acquired by interested Bidders on December 23, 2021 from the given address and website(s) below and upon payment of the applicable fee for the Bidding Documents, pursuant to the latest Guidelines issued by the GPPB, in the amount of Twenty Five Thousand Pesos, PhP 25,000.00. The Procuring Entity shall allow the bidder to present its proof of payment for the fees in person.

6. The Philippine State College of Aeronautics will hold a Pre-Bid Conference on January 3, 2022 (Monday) at 9:00 AM at the PhilSCA Multi-Purpose Hall, Ground Floor of Building – B, PhilSCA, Piccio Garden, Villamor, Pasay City which shall be open to prospective bidders.

7. Bids must be duly received by the BAC Secretariat through manual submission at the office address indicated below on or before 12:30 PM on January 17, 2022 (Monday). Online or electronic submission of bids is not permitted. Late bids shall not be accepted.

8. All Bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in ITB Clause 14.

9. Bid opening shall be on January 17, 2022 (Monday) at 1:00 PM at the given address below. Bids will be opened in the presence of the bidders’ representatives who choose to attend the activity.

10. The Philippine State College of Aeronautics reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Sections 35.6 and 41 of the 2016 revised IRR of RA No. 9184, without thereby incurring any liability to the affected bidder or bidders.
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询