当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Business Name City of Ipswich |
| 发包方国别(国家/地区) | 澳大利亚 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | |
| 发包方网址 | |
| 发包方联系人姓名 | Procurement Officer |
| 发包方联系人座机 | |
| 发包方联系人手机 | +61 (07) 3810 6592 |
| 发包方联系人邮箱 | dniebling@ipswich.qld.gov.au |
| 项目名称 | 17021 DESIGN AND INSTALLATION OF TREE FAIRY LIGHTS IN AUGUSTA PARKWAY |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-07-12 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
In March 2021 Springfield City Group (SCG) presented to Council an Ipswich Gateway Urban Street Tree Lighting Strategy Proposal (Greater Springfield Entry), attached to Tender package. The strategy involves enhancing the amenity and sense of arrival along the key strategic major road network serving the south eastern entrance into the City of Ipswich. The proposal involves the lighting of the street trees (Figs) along Sinnathamby Boulevard and Augusta Parkway. These two gateway roads are annually in the top 5 busiest roads in Ipswich City with an excess of 23,000 vehicle trips per day according to traffic count data.
* The Augusta Parkway Street Tree Lighting Program - Stage 1 Trial involves installing bud accent lighting to the trunk and main limbs of every second fig street tree growing in the central traffic median along Augusta Parkway from the intersection of Eden Station Drive through to Tournament Drive and including the Tournament Drive Roundabout. This involves installation of bud lighting on approximately 12 established fig street trees and 4 trees in the Tournament Drive roundabout. The lighting would be hardwired into the power source associated with the existing street lighting system in the traffic median.
* Stage 1 Trial is being implemented collaboratively between SCG and Council. Council shall be responsible for the delivery of project work up to and including practical completion with SCG taking over maintenance requirements post completion of works.
Desired Outcomes ('Nice to haves', Conditions & Warranties, SLA's, Project benefits)
Details
* Installation of bud lighting on approximately 12 established fig street trees and 4 trees in the Tournament Drive roundabout
* Works to be completed within 16 weeks from commencement of contract/works.
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9