发包方名称 Maynooth University
发包方国别(国家/地区) 爱尔兰
发包方座机
发包方传真
发包方邮箱
发包方地址 Maynooth Co. Kildare Ireland
发包方网址
发包方联系人姓名 Procurement Office
发包方联系人座机 +353 17084683
发包方联系人手机
发包方联系人邮箱
项目名称 PCO/217 - Provision of Medium Voltage Sub Station Maintenance at Maynooth University North Campus.
项目类型 其他 - 其他
项目预算¥
项目投标截止时间 2022-05-16
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
The annual service will be carried out to OEM & ESB requirements, and will include but is not restricted to the following. 

• Provision of ‘Method Statement/Risk Assessment’ before works commence. 
• Injection testing of protection relays, both over-current & earth fault and verification of design consequence. 
• Supply, install and commission 2no. OC / EF relay - Main Supply.
• Operation testing of local protection on transformers, i.e. alarm and trip circuits on over-temperature and pressure relays. 
• Checking MV cable terminations for evidence of heating or discharge. 
• Checking of ‘DC APSU’ for ‘stand by’ and operation of local alarms and trips. 
Checking of main LT connections at transformer end of cable run. 
• Exercising, lubrication and proving of mechanical operation of MV Circuit Breakers. 
• Exercising, lubrication and proving of mechanical operation of MV ‘isolator and/or racking mechanisms. 
• Exercising, lubrication and proving of mechanical operation of MV ‘earth switches. 
• Visual inspection of ‘circuit breakers’ for gas leaks and/or mechanical damage. 
• Replacement of saturated desiccant. 
• Cleaning down of switchgear insulating surfaces, voids, and bushings. 
• Cleaning down of transformer insulating surfaces, voids, and bushings. 
• Visual inspection of ‘ONAN’ transformers for oil leaks and/or mechanical damage. 
• Inspection of MV accommodation/plant-rooms for availability of accessories, safety equipment and safe access. 
• Make recommendations to bring installation up to industries current ‘best practice’. 
• Advise on condition of 20 No. replacement PSU Batteries. Replace where necessary 
• The oil transformers can be subjected to ‘Dissolved Gas Analysis’ (DGA). Take samples and have them analysed for DGA and Oil quality. 
• Organise and schedule an (upstream) ESB isolation to facilitate the works. The cost of this attendance to be included in the quotation. 
• A full report on the overall condition of all associated equipment, control s
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询