欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 S.C RAJA S.A CONSTANTA (r1890420)
发包方国别(国家/地区) 罗马尼亚
发包方座机 +40 726738616
发包方传真 +40 241612283
发包方邮箱 maria.boghici@rajac.ro
发包方地址
发包方网址
发包方联系人姓名
发包方联系人座机
发包方联系人手机
发包方联系人邮箱
项目名称 romania-constanța: construction work.
项目类型 管理咨询服务 - 管理咨询服务
项目预算¥
项目投标截止时间 2022-10-31
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
 romania-constanța: construction work./ water and sewerage networks in the central area of constanța municipality./ the execution activities for the works contract: "water and sewerage networks in the central area of the municipality of constanța"-cl 1a, are grouped on the following s: ob.1. rehabilitation of the water distribution network o rehabilitation by replacing the distribution network - 18,975.00 ml o flap fireplaces - 112 pcs o bransament fireplaces 1438 pcs o meters with remote reading 2617 pcs o underground and above ground hydrants 185 pcs ob.2. sewer network extension o extension of the domestic sewage network – 1,131.00 m o visiting fireplaces – 42 pcs o connections – 8 pcs o connecting fireplaces - 8 pcs ob.3. sewer network rehabilitation o rehabilitation by replacing the household sewage network - 4,154.00 m o visiting fireplaces – 136 pcs o connections – 165 pcs o connecting fireplaces – 165 pcs ob.4. features o handheld terminal with battery for reading water meters - 2 pcs o complete software and hardware for the water meter reading system - 1 pc duration of execution: 610 days (20 months) of which: -sector 1: north zone = 610 days (20 months) -sector 2: south zone = 519 days (17 months) the works refer to: a) construction works b) supply and installation of machinery and technological equipment c) testing and commissioning d) monitoring and providing assistance/consultation to the responsible personnel during the warranty period, when necessary e) fixing any defects that appeared during the 36-month, respectively 1095-day warranty period the duration provided in section ii.2.7 represents the period of execution of the works and does not include the 1095-day warranty period the number of days until which the interested economic operators can request clarifications before the deadline for submission of offers / candidacies is 19 days before the deadline for submission of offers. the contracting entity shall respond clearly and fully to all requests for clarification / additional information as follows: • 25 days before the bid submission deadline for clarification requests submitted 34 days before the bid submission deadline; • 11 days before the bid submission deadline for clarification requests submitted 19 days before the bid submission deadline.
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询