当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Landeshauptstadt München, Baureferat |
| 发包方国别(国家/地区) | 德国 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | bekanntmachungen.vz2.bau@muenchen.de |
| 发包方地址 | |
| 发包方网址 | |
| 发包方联系人姓名 | |
| 发包方联系人座机 | |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | |
| 项目名称 | germany-munich: structural shell work. |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-09-02 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
germany-munich: structural shell work./ construction and planning services for the extension of the u5 to pasing, construction lot 5 west-2 with am knie station, pasing station with siding and tunnel. structural work for the u5 construction lot 5 west-2, section of the u5 extension to pasing in the state capital of munich. this construction lot includes the construction of a new subway tunnel including a launch shaft as well as the construction of two new subway stations, stations am knie and station pasing, with the associated tunnels. it has a length of approx. 2690 m and stretches between the boundary of construction lot 1 on gotthardstrasse. in the east to the end of the tunnel section at pippinger straße in the west. the construction area can be described as inner-city with dense development. the construction of the route tunnel sections is carried out in a closed construction method as a mechanized tunnel drive. the starting shaft for the tunnel drive, which is situated on the border to construction lot 1, is to be constructed using the cut-and-cover method. in addition to the construction work, technical processing must also be carried out, which affects the implementation planning of the structural design and the continuation of the planning.
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9