当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Stadt Eberswalde |
| 发包方国别(国家/地区) | 德国 |
| 发包方座机 | |
| 发包方传真 | +49 333464659 |
| 发包方邮箱 | ausschreibung@eberswalde.de |
| 发包方地址 | |
| 发包方网址 | |
| 发包方联系人姓名 | |
| 发包方联系人座机 | |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | |
| 项目名称 | germany-eberswalde: construction work. |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-08-25 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
germany-eberswalde: construction work./ k17 lot 19 woodwork and fixtures./ during construction, the contractor ensures compliance with all din and legal regulations, the trade and technical guidelines and the specifications of the manufacturer of the construction products. compliance with the recognized rules of technology and architecture is deemed to have been agreed. the masses specified in the bills of quantities cannot simply be used as a basis for material procurement. the contractor must carry out its own quantity determinations on the basis of the execution drawings. during the construction period, the contractor must always deploy sufficient manpower to ensure rapid construction progress and compliance with the agreed interim and contractually agreed completion dates. the contractor ensures the realization of the services with its own workers or via the subcontractors named with the submission of the offer. if, contrary to expectations, further subcontractors have to be involved, the consent of the site management and the client must be obtained before work can begin. the construction work is to be carried out in close coordination with the construction management. in order to ensure a speedy construction process, it is assumed that the contractors involved in the construction will independently agree on details, dates of freedom to build and demolition, provided that decisions by the construction management are not affected or necessary. the construction work is carried out on the basis of the specifications, the execution plan and the construction schedule. operational deviations and stipulations by the construction management are possible. unforeseen services are only to be carried out after a price agreement has been reached and a separate order has been placed. the contractor must keep a construction diary every working day, which is to be submitted to the construction management weekly for confirmation. the storage of the delivered material is only permitted within the construction site at the locations designated by the client. burning, burying or otherwise disposing of leftover material or construction debris on the premises is strictly prohibited. the contractor must check all dimensions on site before starting work. dimensional checks, measurements, etc. are to be carried out under the full responsibility of the contractor. participation of a representative of the client in these measurements does not release the contractor from his responsibility. on request, individual materials, equipment, etc. must be presented to the client for sampling.
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9