欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 DB Station&Service AG (Bukr 11)
发包方国别(国家/地区) 德国
发包方座机 +49 6926545630
发包方传真 +49 6926520071
发包方邮箱 silvia.weck@deutschebahn.com
发包方地址
发包方网址
发包方联系人姓名
发包方联系人座机
发包方联系人手机
发包方联系人邮箱
项目名称 engineering services
项目类型 其他 - 其他
项目预算¥
项目投标截止时间 2022-08-23
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述

engineering services - planning vst saarbrücken ost and rentrisch lph 5-8 in 2 lots. the stop at rentrisch is to be made more attractive for travellers. for the operation of the e-netz saar since 12/2018, the platform in rentrisch is no longer compliant with the rules at less than 38 cm above the top of the rails, which is why it should be raised to a height of 76 cm above the top of the rails. the following measures are planned as part of the project: - new construction of the central platform, platform length: 170m, platform height: 76 cm above sea level, renewal of the platform equipment for station category 6 including wayfinding system and signage in accordance with the equipment catalogue, new construction of the lighting system, modernization of the pedestrian underpass with stairs (the stairs must be "tm 2021-04 - version 1.1" from 08.11.2021 to be replanned), new construction of two weather shelters, saarbrücken ost station is on the saarbrücken main station - homburg saar route and then on the saarbrücken main station - hanweiler route. the stop is to be made more attractive for travelers as part of the project. for this purpose, the replacement of the central platform on platform 1/2 with barrier-free access (elevator) is planned. the following measures are planned as part of the project: - new construction of the central platform on tracks 1/2: - platform length 218 m (useful length 170m), platform height 76 cm above so, new construction/modernization of the existing staircase, new elevator system, core renovation of the pu, renewal of the platform equipment according to station category 5 including wayfinding system and signage according to the equipment catalog for traffic stations - new construction of the lighting systems, new construction of the weather protection according to the specifications of the qkz, dismantling of the lighting systems and wsh on the middle platform track 200 (3/4).
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询