当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Berkshire Healthcare NHS Foundation Trust |
| 发包方国别(国家/地区) | 英国 |
| 发包方座机 | +44 1344415765 |
| 发包方传真 | |
| 发包方邮箱 | tim.shannon@berkshire.nhs.uk |
| 发包方地址 | Fitzwilliam House, Skimped Hill Lane |
| 发包方网址 | https://www.berkshirehealthcare.nhs.uk/ |
| 发包方联系人姓名 | |
| 发包方联系人座机 | |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | |
| 项目名称 | Customer survey services |
| 项目类型 | 客户服务 - 客户服务 |
| 项目预算¥ | |
| 项目投标截止时间 | 2020-08-31 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
Berkshire Healthcare NHS Foundation Trust requires a service provider to improve their measurement, analysis and dissemination of patient feedback. Berkshire Healthcare is seeking to contract with a suitably qualified provider to develop a patient experience measurement to be used across all their services in community and mental health. This should complement the Friends and Family Test (FFT) which is nationally mandated for use as well as any other national patient survey programmes the Trust participates in, for example National Mental Health Survey. This contract will build on previous work done on patient experience themes and consist of two stages which the Trust is referring to as Stage 2 and Stage 3. Stage 2 will include designing the feedback survey and mechanism for collation and data analysis, in collaboration with Berkshire Healthcare’s staff and patients. In this phase the designed measure will be piloted as well as the method of delivery (paper survey/ online/ SMS) across all our services. • design a patient experience questionnaire • pilot the patient experience questionnaire • collate information gathered for services. Stage 3 requires the provider to implement and the new patient experience measure across all services in the Trust and integrate the measurement system within the organisation’s management system, including the analysis of the patient feedback and reporting of the patient feedback to the relevant services in real time. ding the survey will include assurance the survey is being correctly used by all services, there is a standardised application of the measure by all services and guidance as to the best schedule for delivering the survey e.g. after discharge/after every contact/over a set 4 month period annually, etc. This will include the ongoing hosting of the platform to provide analysis of data and deliver the data back to services. The stage 2 and 3 work is expected to take 12 months. The ongoing hosting of the platform will be for a further 3 years. |
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9