当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Scoil Mhuire National School (Ballyhooly) |
| 发包方国别(国家/地区) | 爱尔兰 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | Ballyhooly Co.Cork Ballyhooly Ireland |
| 发包方网址 | |
| 发包方联系人姓名 | Rory Gibbons |
| 发包方联系人座机 | +353 2539638 |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | principal@scoilmhuireballyhooly.ie |
| 项目名称 | Architectural Services for Additional Accommodation at Ballyhooly N.S. |
| 项目类型 | 工程技术服务 - 工程技术服务 |
| 项目预算¥ | |
| 项目投标截止时间 | 2020-09-08 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
Architectural Services for Additional Accommodation at Ballyhooly N.S. Scoil Mhuire, Ballyhooly N.S. is a primary school under the trusteeship of the Catholic Diocese of Cloyne. Please see attached Project Brief & Schedule of Additional Accommodation In summary, the project will comprise: Section A: • 2 Classrooms: 80 m2 each Giving a floor area including circulation and internal walls of: 204.8 m2 Section B • 2 Classroom SEN 343.2 m2 • Giving a floor area (incl circulation and internal walls) of 439.3m2 Giving a Gross Floor Area for Section A & B (including circulation, internal walls, stairs and lift) of 764 m2 Also: • Secure Hard and soft play area 200 m2 • Sensory Garden 100 m2 • 6 parking spaces • Consultants are reminded to note especially that, as per the Project Brief, the Design Team will be required to explore all possibilities (including the options mentioned in the Brief) for providing the required accommodation on site while maximising the available play space on site INTERIM TEMPORARY ACCOMMODATION • Please note: Once appointed, the Design Team (DT) will be tasked with the provision of interim temporary accommodation (100 m2), including all required statutory approvals and compliances, to be used by the school until such time that the permanent structure has been completed. The DT are to ensure that the location of the interim temporary accommodation does not impede the development of the permanent additional accommodation. • All of the above interim temporary accommodation shall be removed from the school upon completion of the permanent structure and the site reinstated (as provided for in the Brief). |
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9