当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | University College Dublin ( UCD ) |
| 发包方国别(国家/地区) | 爱尔兰 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | Procurement and Contracts Office Roebuck Offices Belfield Ireland |
| 发包方网址 | |
| 发包方联系人姓名 | Orla O'Dea |
| 发包方联系人座机 | +353 17164990 |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | procurement@ucd.ie |
| 项目名称 | New Services, Infrastructure & Utilities Diversions |
| 项目类型 | 工程技术服务 - 工程技术服务 |
| 项目预算¥ | |
| 项目投标截止时间 | 2020-09-07 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
The proposed works comprise New Services including Diversions, Utilities, Attenuation & Su formation for parts of Phase 1 of the Future Campus; approximately 3 hectares in total (part occupied by buildings, car parking, ancillary structures, paving and soft landscaping not part of this contract). The services installations will include Polyethylene, Clay & PVC pipework for Foul & Storm Water Sewers, Telecoms, Electricity, Watermains & Gas mains to serve new academic buildings. Excavation depths will range from <1m to c.5m deep, including connection to existing campus services infrastructure. Diversions of MV Ring Main & 4‐bar Gas main including interface & coordination with utility providers, approximately 400m of New & realigned access road sub-, junctions, roundabout, traffic management, planned shut‐downs, temporary works, earthworks, formation of paths, lighting installations. The role of PSCS will include risk monitoring & mitigation, vehicular, cyclist & pedestrian traffic management, phasing & sequencing, monitoring of no‐dig zones including tree protection & compliance with all H&S requirements. Co‐ordination with other works contractors in the vicinity of the site will also be necessary. Upon completion of the project the successful candidate will be required to deliver a fully completed Operations and Maintenance Manual (fully indexed, electronic version) incorporating a Safety File and as constructed drawings, BIM model (to level 2 coordination) for the as‐built situation. The work will involve significant management & coordination with the University and their consultants as well as 3rd party service providers. The site is located within a live university campus comprising c.29,000 students and 3,500 staff. The works must have minimum disruption on the daily operations of the University. The applicant is required to demonstrate the capacity of its management personnel to deliver similarly complex projects in similar environments.
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9