Market cooperation| 发包方名称 | CITY OF BAYAWAN, NEGROS ORIENTAL |
| 发包方国别(国家/地区) | 菲律宾 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | BAC Secretariat Office G/F New Legislative Building, New Government Center, Cabcabon, Brgy. Banga Bayawan City Negros Oriental Philippines 6221 |
| 发包方网址 | |
| 发包方联系人姓名 | Ronald D. Elnar |
| 发包方联系人座机 | 63-35-4300281 Ext.1210 |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | bac.bayawan@gmail.com |
| 项目名称 | To provide materials, labor, fuel and equipment for the Construction of 2nd Floor of BCTLDC Workshop Area (ITB21-109) |
| 项目类型 | 工程技术服务 - 工程技术服务 |
| 项目预算¥ | |
| 项目投标截止时间 | 2021-05-25 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
The City of Bayawan, through its Bids and Awards Committee (BAC), invites suppliers/manufacturers/distributors/contractors to bid for the hereunder projects:
Lot No. I To provide materials, labor, fuel and equipment for the Construction of 2nd Floor of BCTLDC Workshop Area
1. A.) GENERAL REQUIREMENTS
A.1 1 lot Billboards
2. B.) STRUCTURAL CONCRETE (incl. forms and scaffoldings)
B.1 1 lot Column Footing, 3,000 psi 2.1 Column Footing, 3,000 psi 2.1 Column Footing, 3,000 psi 2.1 Column Footing, 3,000 psi 2.1 Column Footing, 3,000 psi
B.2 1 lot RC Columns, 3000 psi 2.2 RC Columns, 3000 psi 2.2 RC Columns, 3000 psi 2.2 RC Columns, 3000 psi 2.2 RC Columns, 3000 psi
B.3 1 lot RC Beam, 3000 psi 2.3 RC Beam, 3000 psi 2.3 RC Beam, 3000 psi 2.3 RC Beam, 3000 psi 2.3 RC Beam, 3000 psi
B.4 1 lot RC Roof Beams, 3000 psi 2.4 RC Roof Beams, 3000 psi 2.4 RC Roof Beams, 3000 psi 2.4 RC Roof Beams, 3000 psi 2.4 RC Roof Beams, 3000 psi
B.5 1 lot "Slab-on-Fill, 0.10m thick on stair landing and
concrete gutter, 3000 psi" "Slab-on-Fill, 0.10m thick on stair landing and
2.5 concrete gutter, 3000 psi" "Slab-on-Fill, 0.10m thick on stair landing and
2.5 concrete gutter, 3000 psi" "Slab-on-Fill, 0.10m thick on stair landing and
2.5 concrete gutter, 3000 psi" "Slab-on-Fill, 0.10m thick on stair landing and
2.5 concrete gutter, 3000 psi"
B.6 1 lot RC Stair, 3000 ps 2.6 RC Stair, 3000 ps 2.6 RC Stair, 3000 ps 2.6 RC Stair, 3000 ps 2.6 RC Stair, 3000 ps
B.7 1 lot Concrete Formworks and Scaffoldings 2.7 Concrete Formworks and Scaffoldings 2.7 Concrete Formworks and Scaffoldings 2.7 Concrete Formworks and Scaffoldings 2.7 Concrete Formworks and Scaffoldings
3. C.) MASONRY
C.1 1 lot "Wall: 4"" thk CHB w/ 10mmØ vertical bars
spaced @ 0.60m o.c. and 10mmØ horizontal bars every after 2nd with plastering"
C.2 1 lot Plastering, 16mm thick
4. D.) ROOFING WORKS
D.1 1 lot "Supply and Installation of Long Span, Rib Type
(high-rib), 0.40mm thick Terracotta Orange-
colored Pre-painted, bended and complete
accessories"
D.2 1 lot Downspout
5. E.) STEEL WORKS
E.1 1 lot "Supply, Fabrication, and Installation of Steel
Trusses, Sag Rods, Cross Bracings with Turn
Buckles"
E.2 1 lot "Supply, Fabrication, and Installation of Steel
Railings and Window Grills"
6. F.) GLASS DOORS
F.1 1 lot "Supply, Fabrication and Installation of Glass
Door"
7. G.) ELECTRICAL WORKS
G.1 1 lot Staking Materials 7.1 Staking Materials 7.1 Staking Materials 7.1 Staking Materials 7.1 Staking Materials
G.2 1 lot Transformers and Accessories 7.1 Staking Materials 7.1 Staking Materials 7.1 Staking Materials 7.1 Staking Materials
G.3 1 lot Rough-in Works (Pipings, Conduits, Boxes, Tapes, and Fittings) & Others 7.3 Rough-in Works (Pipings, Conduits, Boxes, Tapes, and Fittings) & Others 7.3 Rough-in Works (Pipings, Conduits, Boxes, Tapes, and Fittings) & Others 7.3 Rough-in Works (Pipings, Conduits, Boxes, Tapes, and Fittings) & Others 7.3 Rough-in Works (Pipings, Conduits, Boxes, Tapes, and Fittings) & Others
G.4 1 lot Wirings Works 7.4 Wirings Works 7.4 Wirings Works 7.4 Wirings Works 7.4 Wirings Works
G.5 1 lot Lighting and Other Electrical Fixtures 7.5 Lighting and Other Electrical Fixtures 7.5 Lighting and Other Electrical Fixtures 7.5 Lighting and Other Electrical Fixtures 7.5 Lighting and Other Electrical Fixtures
G.6 1 lot Devices, Switches, and Convenience Outlets 7.6 Devices, Switches, and Convenience Outlets 7.6 Devices, Switches, and Convenience Outlets 7.6 Devices, Switches, and Convenience Outlets 7.6 Devices, Switches, and Convenience Outlets
G.7 1 lot Circuit Breakers 7.7 Circuit Breakers 7.7 Circuit Breakers 7.7 Circuit Breakers 7.7 Circuit Breakers
** ** ** nothing follows ** ** **
Bid documents shall be available at the BAC Office, New City Hall, LGU Bayawan City upon payment of prescribed non-refundable fee.
Bidders shall drop their technical and financial proposals in the bid box at the BAC Office, Bayawan City on or before the deadline for submission of bids.
All particulars relative to eligibility process, opening and evaluation of bids, post- qualification and award of contract shall be governed by the applicable provisions of RA. 9184.
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9