欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 Commission for Regulation of Utilities
发包方国别(国家/地区) 爱尔兰
发包方座机
发包方传真
发包方邮箱
发包方地址 The Grain House, The Exchange, Belgard Square North,Dublin 24 D24 PXW0,Tallaght,Ireland
发包方网址
发包方联系人姓名 Theresa Metcalfe
发包方联系人座机 +353 14000800
发包方联系人手机
发包方联系人邮箱 procurement@cru.ie
项目名称 011-03-459 - Provision of Economic Consultancy Support for a new Irish Water Trade Effluent Charging Policy
项目类型 其他 - 其他
项目预算¥
项目投标截止时间 2021-10-13
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
The Commission for Regulation of Utilities (“CRU”) is Ireland’s independent energy and water regulator. The CRU’s mission is to protect the public interest in Water, Energy and Energy Safety. The CRU is guided by four strategic priorities that sit alongside the core activities we undertake to deliver on the public interest. 

In July 2019, the CRU published its decision on Irish Water’s Non-Domestic Tariff work which will apply to Irish Water’s non-domestic customers . This work will introduce a harmonised suite of tariffs for non-domestic water and wastewater customers on 1st October 2021.

Developing enduring TE charging proposals was originally within the scope of the Non-Domestic Tariff work. However, Irish Water informed the CRU that it did not have sufficient data on TE discharges to propose an enduring charging policy at that time.  Therefore, the CRU decided that Irish Water maintain the existing Local Authority TE charging arrangements for an interim period as Irish Water had insufficient cost evidence at the time to propose an enduring policy for charging TE discharges.

Irish Water still does not have sufficient data to generate enduring TE charging proposals.  However, the CRU is of the view that it would not be beneficial to wait for greater cost and discharge data to be available to Irish Water as this may take a number of years for Irish Water to gather. The CRU therefore is considering a number of options to develop interim TE charging arrangements that could be implemented in the near term, that is, until Irish Water has greater cost and discharge data (and the enduring arrangements can be implemented).

The high-level approach to the project is as follows:

1) Consult on the future (enduring) and interim TE arrangements;
2) Decide on interim TE arrangements and specific interim TE charge levels;
3) Assessment of how well the enduring and interim TE charging arrangements meet the tariff principles.
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询