ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of of
22BK0086 - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of San Pedro River Control (along Cagaya
Upgrading/Improvement of Waterworks System (Design & Build of a Water Treatment Plant,Surface Water Abstraction Facility,Pumping Stations,Transmission Pipeline,Reservoir inc. Testing and Commissioning
22FK0064-Cluster XXVI-Convergence and Special Support Program (CSSP)-Construction/Improvement of Various Infrastructure in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at S
Three (3) Lots Engagement of Chartered Aircraft Services (Big Aircraft) for BSP Shipments of Official Cargoes to the following Areas, as per BSP Technical Specifications and Terms of Reference: Lot 1